Dammam · Saudi Arabia

+966 55 000 0000
A large industrial warehouse with metal racks and storage aisles
AboutGC-CO / 01

A supplier, not a broker: stock, documents and a team that reads the specification.

GulfCore Industrial is an industrial supply company based in Dammam. We buy, stock, inspect and document, then deliver. We do not pass your order to a third party and take a commission.

Our role

Between the mill and the site is a gap filled with documents, not talk.

Most industrial supply problems do not start with price. They start with an incomplete line, a certificate that does not match the heat number, or a date nobody confirmed. Our work is to close that gap before it reaches site.

We keep stock for recurring lines, order non-recurring items from mills whose certificates we know, and machine small parts locally. In all three cases, inspection and documents are our responsibility.

COMPANY SHEET / GC-CO
Founded
2014
Base and warehouse
Dammam Second Industrial City, King Fahd Road, Building 14
Business model
Direct supply from stock and approved mills.
Coverage
Dammam · Jubail · Riyadh · Jeddah
Documents
EN 10204 3.1 · MTC · COO
[01] Sourcing network

Three sources, one acceptance standard.

The source changes with the line and the date, but inspection and documents do not. Every source passes the same acceptance gate.

SRC-A

Local stock

Recurring lengths and sizes in the Dammam warehouse: carbon and stainless pipe, flanges, fittings and gaskets. Shipped from stock after inspection.

SRC-B

Approved mills

Mills in the Gulf, Europe and Asia on an order basis, with mill certificate and marking reviewed before acceptance. We do not buy from an unknown source.

SRC-C

Partner machine shops

Local turning, milling and cutting shops working to our drawings or the client’s, with dimensional inspection before handover.

WAREHOUSE / WH-01Dammam
  • 01Stainless, carbon and alloy kept on separate racks
  • 02Each package marked with line and heat number before put-away
  • 03PMI for austenitic and duplex material before storage
  • 04FIFO issue with the heat number recorded on the issue note

Warehouse

What is stocked must be known by origin.

Stock is not a pile of parts. Every rack is tied to a line, a heat number and a document. Stainless, carbon and alloy do not mix, and a part that loses its marking leaves stock.

2,400 م²
covered, racked area
6 / 12 م
standard pipe lengths
PMI
check before put-away for alloys
SEG
stainless and carbon kept on separate racks
[02] Team

Four roles, one responsibility for the order.

Your order does not move between departments without a name. Each file has a technical sales owner from quotation to delivery, backed by inspection, procurement and warehouse.

TEAM-01

Technical sales engineer

Reads the specification and purchase order, fixes gaps before pricing, and stays the single contact for the order.

TEAM-02

Procurement officer

Orders from approved mills, compares certificates and prices, and obtains written lead-time confirmation.

TEAM-03

Quality inspector

Performs incoming, dimensional and pressure inspection, reviews the MTC, and can quarantine any non-conforming item.

TEAM-04

Warehouse and logistics

Runs racking and segregation, prepares packing and marking, and assembles the shipping file before loading.

[03] Order flow

From material list to delivery file, in five steps.

Every step has a written output. The next step does not start until the output is complete, even if that means one more question at the start.

  1. 01

    RFQ received

    We receive the line list, drawing or part number. Missing data is requested before pricing.

  2. 02

    Specification review

    We fix the standard, grade, size, pressure and required test. An unclear line is not priced.

  3. 03

    Written quotation

    A price per line, supply source, dispatch date and document list. The validity period is stated.

  4. 04

    Purchase and inspection

    After the purchase order we allocate or order material, then inspect and match certificates before packing.

  5. 05

    Delivery and file

    Delivery on the agreed date with packing list, delivery note and certificates. Documents are not sent later.

Clear limits

What we do not do is written before what we do.

A supplier who accepts everything documents nothing. These limits protect the order from expectations the file cannot support.

  • We do not manufacture pressure vessels or install material on site.
  • We do not claim API or ISO certification or licensing; certificates come from the manufacturer and are supplied as issued.
  • We do not supply material we cannot link to a certificate and heat number.
  • We do not promise a date the supplier has not confirmed in writing.

Start with one file

Send one line and see the difference in the quotation.

You do not need a contract or a minimum volume to start. We need the specification, quantity and date.