Quality and documentsGC-QC / 01

Inspection starts at receipt and ends with a complete delivery file.

A delivery is not accepted because it came from a supplier we know. We open it, read its marking, match its certificate and measure a sample. Then we accept it or quarantine it.

EN 10204 3.1

Matched mill certificate

API 6D / ASTM

Supply to specification

NCR

Quarantine and corrective action

The process

Five steps. A record for each one.

The file is built with the order, not assembled afterwards. Each step produces a sheet, a photo or a number that can be checked months later.

QC-01

Incoming inspection

Every delivery is opened and inspected before it enters stock. Nothing is accepted on trust.

  • Quantity and description against the purchase order
  • Reading the marking, heat number and standard
  • Visual check for damage, corrosion and packing
  • Sampling dimensions, facing and bolt pattern

RECORD / Receipt photos + heat number + accept or quarantine result.

QC-02

Material certificate review

We match the MTC to the required standard, grade and heat number — not just to the supplier name.

  • EN 10204 3.1 MTC for specified materials
  • Chemistry and mechanical properties compared to standard
  • Heat number matched to marking and packing list
  • PMI for austenitic, duplex and alloy material

RECORD / Certificate copy in the order file + match result + PMI result.

QC-03

Dimensional and pressure testing

Dimensions are checked on a sample, and valves are pressure-tested where the specification requires it.

  • Flange dimensions to ASME B16.5 / B16.47
  • Fitting dimensions to ASME B16.9 / B16.11
  • Hydrostatic test for valves to API 6D
  • NDT on request: RT, UT or PT

RECORD / Dimensional report + pressure report + NDT report where applicable.

QC-04

Non-conformance handling

A non-conforming item is quarantined and tagged. It does not ship to the client under time pressure.

  • Opening a numbered NCR with a clear cause
  • Quarantine and tagging in a separate location
  • Supplier claim for replacement or credit
  • Root-cause correction before reordering from the source

RECORD / NCR report + corrective action + closure status.

QC-05

Packing and shipping documents

A part does not ship until its file is complete: marking, protection, packing list and certificate.

  • End caps and protection for facings and pipe ends
  • Material segregation and each package marked with its number
  • Packing list, delivery note and certificate of origin
  • Loading and packing photos before closing

RECORD / A complete shipping file handed over with the order, not emailed afterwards.

Document file

The document is requested before purchase, not after the shipment arrives.

The required documents are fixed in the quotation. If the mill cannot issue a certificate, we say so before the purchase order instead of promising it after delivery.

Origin certificates and MTCs are issued by the manufacturer. Our role is to match them to the order and heat number, not to issue them.

CodeDocumentWhen required
DOC-01Mill test certificate (MTC)EN 10204 3.1 for specified materials
DOC-02Dimensional reportOn client request or for critical items
DOC-03Pressure test reportFor valves requiring a test
DOC-04NDT reportRT / UT / PT on request
DOC-05Packing listWith every shipment
DOC-06Certificate of originWhen required for clearance
DOC-07Delivery noteWith every shipment

Scroll the table sideways to see all columns.

[02] What is checked

Six checks, according to what the specification says.

We do not impose a test on a line that does not need it, and we do not skip one the specification requires. Extra testing costs; missing testing delays start-up.

T-01

API 6D

Hydrostatic test

For valves whose specification requires it, recording pressure, duration and result.

T-02

Alloy check

PMI analysis

To verify alloy chemistry in austenitic, duplex and alloy material, by calibrated instrument or independent lab.

T-03

ASME B16.5 / B16.9

Dimensional check

Diameter, length, facing, bolt holes and wall thickness, on a sample or the full line depending on criticality.

T-04

On request

Third-party NDT

RT, UT or PT on request through an independent lab, with the report attached as issued.

T-05

QC-01

Visual and marking check

Damage, corrosion, packing, marking legibility and heat-number match before put-away.

T-06

Specification

Hardness where required

Requested for lines with a hardness limit in the specification, recorded in a separate report.

Supply statement

We supply to API 6D and ASTM specifications.

This is a statement of supply capability: we read the specification, order the correct line and match its certificate. It is not a claim of API or ISO certification or licensing, and does not mean our facility is a certified manufacturer.

Manufacturer certificates are attached as issued. If your project requires third-party certification or audit, we state the limits of what we can provide before pricing.

SUPPLY SCOPE
Specification references
API 6D · ASTM · ASME
Material certificates
EN 10204 3.1 / 2.2
Third-party inspection
Available by arrangement
What we do not claim
API or ISO certification of the facility

Packing and shipment

The part arrives as it left, or it does not leave.

End caps, protected flange facings, and every package separated and marked with its number. A shipment that needs sorting on site is not an organised shipment.

Ask about packing for your project
  • PK-01

    End caps and facing protection

  • PK-02

    Each package marked with the line number

  • PK-03

    Packing list and delivery note

  • PK-04

    Loading photos before closing